Journeymen mark
Real Knowledge - Verified

← All states

California — electrical code & licensing

Verified

The code

Edition in force2023 NEC, adopted with California amendments as the 2025 California Electrical Code (Title 24, Part 3)
Edition structureOne statewide edition
State codeCalifornia Electrical Code
Effective date2026-01-01
Date as recorded2026-01-01
Adopted byCalifornia Building Standards Commission (CBSC), Department of General Services
Adoption sourcehttps://www.dgs.ca.gov/-/media/Divisions/BSC/02-Codes/Errta-01012026-Pt3-CEC-locked.pdf
State amendmentsState amendments at their own official document — http://www.dgs.ca.gov/en/BSC/Codes

Licensing

ModelState licensing in two tracks: CSLB licenses electrical contractors (classification C-10); the Department of Industrial Relations certifies individual electricians (General, Residential, Voice Data Video, Fire/Life Safety, Nonresidential Lighting)
AuthorityContractors State License Board (CSLB); Department of Industrial Relations (DIR), Electrician Certification Program
Licensing sourcehttps://www.cslb.ca.gov/About_Us/Library/Licensing_Classifications/Default.aspx
License classeshttps://www.cslb.ca.gov/About_Us/Library/Licensing_Classifications/Licensing_Classifications_Detail.aspx?Class=C10

Permits & inspections

Health & Safety Code s.18938.5: only building standards in effect at the time of permit application apply to the project. Enforcement is by local building officials; no state electrical permit system was established.

How this record was verified

AdoptionVerified
AmendmentsVerified
LicensingVerified
Permits & inspectionsVerified
Working notes

In force on the retrieval date. Prior edition: 2022 California Electrical Code (2020 NEC), effective 2023-01-01. The CBSC Codes landing page (amendments_url) still carries older-cycle Part 3 links; the 2025 adoption is proven by the CBSC errata History Note (adoption_source_url). DIR certification categories per Title 8, s.291.0: http://www.dir.ca.gov/t8/291_0.html

Coded to schema v2 Option B at the 2026-10-27 wiring pass from the v1 row verbatim; migration settles no open facts.

Compiled from the official sources above; retrieved 2026-10-25. Record basis: official text read firsthand.

Reference only. Compiled from the cited official sources as of the date shown; adoptions and rules change. Confirm with the authority having jurisdiction before designing or permitting work.