Journeymen mark
Real Knowledge - Verified

← All states

North Dakota — electrical code & licensing

Verified

The code

Edition in force2026 NEC (NFPA 70-26), as amended by the North Dakota Wiring Standards (NDAC Title 24.1)
Edition structureOne statewide edition
Effective date2026-07-01
Date as recorded2026-07-01
Adopted byNorth Dakota State Electrical Board
Adoption sourcehttps://www.ndseb.com/?id=41
State amendmentsState amendments at their own official document — https://www.ndseb.com/image/cache/2026_Laws_Rules_Wiring_and_Conveyance_Standards.pdf

Licensing

ModelState licensing of individual electricians by the State Electrical Board; the Board states it has jurisdiction over all electrical installations in the state
AuthorityNorth Dakota State Electrical Board
Licensing sourcehttps://www.ndseb.com/?id=41
License classeshttps://www.ndseb.com/image/cache/2026_Laws_Rules_Wiring_and_Conveyance_Standards.pdf

Permits & inspections

Electrical installations run on electrical wiring certificates filed with the Board (NDAC ch. 24.1-05); the Board's inspection program operates statewide.

How this record was verified

AdoptionVerified
AmendmentsVerified
LicensingVerified
Permits & inspectionsVerified
Working notes

Classes: Master, Journeyman, Class B, and Power Limited electricians, plus apprentice registration (NDCC ch. 43-09; NDAC ch. 24.1-03). Prior standards: 2023 NEC-based, eff. 2024-07-01. STALE-TEXT FLAG: the Board's own Laws & Rules page scope text still describes its standards as built on the 'NFPA 70 2023 edition' even though the same page lists the 2026 Laws, Rules, Wiring and Conveyance Standards (eff. 2026-07-01) above the 2023 booklet; the 2026 booklet itself is built on NFPA 70 (2026) throughout and controls. NFPA enforcement map corroborates ND as 2026 NEC eff. 2026-07-01. 2026 NEC 230.70(A)(1) emergency disconnect: STANDS AS WRITTEN for ND - Admin. Code ch. 24.1-03-01 (eff. 2026-04-01) carries no amendment to (A)(1); the chapter's separate single-accessible-location rule for service disconnects is an added state rule, not an (A)(1) amendment (per hunt-18 (files/journeyman/electrical/documents/hunt-18-230-70-a1-adoption-map.md), retrieved 2026-10-25).

Coded to schema v2 Option B at the 2026-10-27 wiring pass from the v1 row verbatim; migration settles no open facts.

Compiled from the official sources above; retrieved 2026-10-25. Record basis: official text read firsthand.

Reference only. Compiled from the cited official sources as of the date shown; adoptions and rules change. Confirm with the authority having jurisdiction before designing or permitting work.