| Edition in force | 2023 NEC (NFPA 70, 2023 edition), adopted in the Vermont Electrical Safety Rules (VESR) s.5 with Vermont amendments stated in the same section |
| Edition structure | One statewide edition |
| Effective date | 2025-11-05 |
| Date as recorded | 2025-11-05 (2025 Edition VESR, per Division of Fire Safety listing) |
| Adopted by | Commissioner of Public Safety and the Electricians' Licensing Board, under 26 V.S.A. ch. 15 (administered by the Division of Fire Safety) |
| Adoption source | http://firesafety.vermont.gov/licensing/electrical |
| State amendments | State amendments at their own official document — https://firesafety.vermont.gov/sites/firesafety/files/Rules/2023%20VESR%20Proof%20Copy.pdf |
| Model | State licensing by the Electricians' Licensing Board / Division of Fire Safety (Master, Journeyman, Type-S Journeyman specialty licenses) |
| Authority | Vermont Electricians' Licensing Board and Commissioner of Public Safety, Division of Fire Safety, Department of Public Safety |
| Licensing source | http://firesafety.vermont.gov/licensing/electrical |
| License classes | https://firesafety.vermont.gov/sites/firesafety/files/Rules/2023%20VESR%20Proof%20Copy.pdf |
State-level permit equivalent: an Electrical Work Notice (EWN) must be filed with and validated by the Division of Fire Safety before electrical work in a complex structure (public building) begins; inspections are by state electrical inspectors, with municipal inspection authorized under 26 V.S.A. s.898 (VESR s.7).
| Adoption | Verified |
| Amendments | Verified |
| Licensing | Verified |
| Permits & inspections | Verified |
transition cutoff → 2023 NEC
Work in process, or under a work notice validated and commenced within 30 days, may be completed under the 2020 VESR / 2020 NEC.
SPLIT/TRANSITION STRUCTURE (do not flatten): the posted VESR proof copy carries an internal effective date of September 1, 2025, while the Division's official listing gives the 2025 Edition as effective 11/05/2025 (after LCAR review, rule 25P023, status Adopted per the Secretary of State rules service); the Division listing date is recorded. VESR s.10 transition: work in process at adoption, or under a work notice validated and commenced within 30 days, may be completed under the 2020 VESR (2020 NEC). Vermont amendments are inside VESR s.5 itself (e.g., replacements/additions at 210.8, 210.12, 230.70, 334.10/334.12, 518.6) - summaries only, no NEC text reproduced. Licensing scope note from VESR s.3: license required for electrical work other than in residential buildings of two or fewer dwelling units and NEC Art. 800 work, subject to 26 V.S.A. s.910 exceptions.