Partially verified
| Edition in force | 2020 NEC (NFPA 70, 'National Electric Code, 2020 Edition') incorporated by reference in the Maryland Building Performance Standards (MBPS), COMAR 09.12.51, with a Maryland amendment at Art. 210.8(F) [citation pairing: the linked source page is COMAR 09.12.50.02-1, which states this incorporation verbatim and cross-references COMAR 09.12.51.04 - see notes] |
| Edition structure | One statewide edition |
| Effective date | 2023-05-29 |
| Date as recorded | 2023-05-29 (current MBPS version, 2021 I-Code based) |
| Adopted by | Maryland Department of Labor, Building Codes Administration (MBPS adopted by regulation under Public Safety Article, Title 12, Subtitle 5) |
| Adoption source | https://regs.maryland.gov/us/md/exec/comar/09.12.50.02-1 |
| State amendments | Amendments ride in the adoption document itself — https://regs.maryland.gov/us/md/exec/comar/09.12.50.02-1 |
| Model | State licensing by the Maryland State Board of Electricians (master, journeyperson, apprentice) SINCE July 1, 2021 - layered over local registration: local jurisdictions may no longer issue apprentice/journeyperson/master licenses (Bus. Occ. Art. s.6-103(c)) but retain registration, permit, fee and inspection systems |
| Authority | Maryland State Board of Electricians, Division of Occupational and Professional Licensing, Maryland Department of Labor |
| Licensing source | https://labor.maryland.gov/LICENSE/elec/eleclicfaqs.shtml |
| License classes | https://labor.maryland.gov/LICENSE/elec/eleclicfaqs.shtml |
Per the State Board's official FAQ: a state licensee may also have to obtain a registration in a local jurisdiction to provide electrical services and obtain a permit there; contact the county/city for its requirements. Local jurisdictions enforce the State electrical code or a local code (s.6-103 preserves local regulation of quality/character of work, permits and inspections).
| Adoption | Partially verified |
| Amendments | Verified |
| Licensing | Verified |
| Permits & inspections | Verified |
NOTABLE SPLIT STRUCTURE (do not flatten): (1) Licensing moved to the State on 2021-07-01 (Board FAQ Q1: state license required; Board issues master and began accepting apprentice/journeyperson applications July 1, 2021), while permits/inspections and local registration remain local - the classic Maryland layering, now state-license-first. (2) Code layering: the MBPS incorporation list (COMAR) names the NEC 2020 edition with one stated Maryland amendment (Art. 210.8(F) exception extended to HVAC/refrigeration equipment serving the dwelling); separately, Bus. Occ. Art. s.6-205 obliges the Board to enforce minimum standards consistent with the most recently issued NEC within 18 months of issuance - a Board-level newer-edition adoption could NOT be verified from an official page this pass, so the in-force MBPS edition (2020) is recorded and the possible Board-layer update is flagged unverified, not promoted. MBPS effective date is the current Standards version date; local jurisdictions enforce MBPS as the statewide minimum and may amend locally. CITATION PAIRING TIGHTENED (E-FIX 1, 2026-10-25, per E-QA 1 defect D-4): the adoption_source_url / amendments_url in this row resolve to COMAR 09.12.50.02-1 ('.02-1 Incorporation by Reference'), not to a 09.12.51 page. That page was opened firsthand in E-QA 1 and re-opened in E-FIX 1: its item (3) states verbatim 'National Electric Code, 2020 Edition (NFPA 70), except in Article 210.8(F) Ground-Fault Circuit Interrupter Protection for Personnel, Outdoor Outlets Exception include "and heating, air-conditioning, and refrigeration equipment that serve the dwelling"' - exactly the edition and amendment recorded here - and its companion items cross-reference COMAR 09.12.51.04 for the I-Code incorporations into the MBPS. The recorded fact is unchanged; only the citation pairing is clarified. The MBPS chapter text at 09.12.51 itself has not been opened firsthand, and the s.6-205 Board layer above remains the reason this row is partial. S.6-205 BOARD LAYER READ (E-DATA-FOLLOWUP 2, 2026-10-25): the s.6-205 layer is now read firsthand on official Maryland sources. (i) Statutory duty text: s.6-205(a)(3) as printed verbatim in the official enacted bill files on mgaleg.maryland.gov (SB 994 / HB 1127 first readers, 2020 Session - the Maryland Electricians Act, chapters 159/160): the Board must 'ENFORCE, WITHIN 18 MONTHS OF ISSUANCE, MINIMUM STANDARDS FOR THE PROVISION OF ELECTRICAL SERVICES CONSISTENT WITH THE MOST RECENTLY ISSUED VERSION OF THE NATIONAL FIRE PROTECTION ASSOCIATION 70: NATIONAL ELECTRICAL CODE.' (ii) The Board's own Maryland Electricians Act page (dllr.state.md.us/license/elec/elecnamech.shtml) states the same duty and adds: 'The Board has 18 months within which to do so; presently, the Board is working diligently to promulgate those regulatory provisions...' (iii) The Board's continuing-education regulation (COMAR 09.14.01, published via the AELR on mgaleg) cites s.6-205(B)(1) (standards adopted by a local jurisdiction) and s.6-205(B) (the NEC as adopted by the Board) - the subsection (B) structure contemplates Board and local standards side by side. (iv) The Board FAQ (this row's licensing URL) says only that the license examination is 'based on the current NEC Codes' - no edition named. NEGATIVE FINDING, stated plainly: no official Maryland page found states that the Board has promulgated s.6-205 minimum standards naming a specific NEC edition, and the Board's own Act page still describes that promulgation as in progress; the codified StatuteText route on mgaleg did not render through this lane's text fetch, so the statute text rests on the official enacted bill files plus the Board's own summary. The in-force construction edition therefore stays the MBPS 2020 NEC recorded above. PARTIAL is retained, with the reason narrowed: the s.6-205 text layer is closed; what remains unverified is whether the Board has exercised s.6-205 to adopt standards on a newer NEC edition. (The MBPS chapter text at COMAR 09.12.51 itself also remains unopened firsthand; the incorporation is read at 09.12.50.02-1.)
Reference only. Compiled from the cited official sources as of the date shown; adoptions and rules change. Confirm with the authority having jurisdiction before designing or permitting work.