Verified
| Edition in force | 2023 NEC (NFPA 70), adopted in WAC 296-46B (WSR 24-05-085) |
| Edition structure | One statewide edition |
| Effective date | 2024-04-01 |
| Date as recorded | 2024-04-01 |
| Adopted by | Washington Department of Labor & Industries (L&I), Electrical Program, under RCW 19.28 |
| Adoption source | http://lawfilesext.leg.wa.gov/law/wsr/2024/05/24-05-085.htm |
| State amendments | State amendments at their own official document — https://www.lni.wa.gov/licensing-permits/electrical/laws-rules-policies |
| Model | State licensing and certification by L&I: electrical contractors are licensed and individual electricians (journey level and specialty) are certified by the state |
| Authority | Washington Department of Labor & Industries (L&I), Electrical Program |
| Licensing source | https://www.lni.wa.gov/licensing-permits/electrical/laws-rules-policies |
| License classes | https://www.lni.wa.gov/licensing-permits/electrical/laws-rules-policies |
Electrical work in Washington requires a permit and inspection, with exceptions at WAC 296-46B-901 (verified firsthand on the L&I permits page). Permits are purchased by the electrical contractor or by the property owner/homeowner doing the work. If the jobsite is in a city that does its own permits and inspections, or in Tacoma Power service area, the permit and inspection come from that jurisdiction; all other jobsites are permitted and inspected by L&I. L&I states it inspects electrical work using the 2023 NEC.
| Adoption | Verified |
| Amendments | Verified |
| Licensing | Verified |
| Permits & inspections | Verified |
next adoption → 2026 NEC · effective 2026-12-31
PENDING — NOT IN FORCE: the 2026 NEC is adopted with an effective date of 2026-12-31; the in-force edition remains 2023. Do not promote the 2026 edition.
Adoption verified firsthand in the official Washington State Register filing (WSR 24-05-085, filed 2024-02-21, effective 2024-04-01) and on the L&I permits page (L&I inspects electrical work using the 2023 National Electrical Code). PENDING - NOT IN FORCE: L&I rulemaking material adopts the 2026 NEC with an effective date of 2026-12-31 (L&I adopted-standards proposal, https://www.lni.wa.gov/licensing-permits/_docs/2508-Proposal-Adopted-Standards.pdf); at the retrieval date the in-force edition remains 2023, recorded here - do not promote the 2026 edition. Washington amendments ride inside WAC 296-46B itself; the L&I laws/rules page is the amendments reference. The 01 journey-level pathway moved to an apprenticeship-only model effective 2023-07-01 per L&I material; full class-by-class detail was not re-verified page-by-page this pass.
Reference only. Compiled from the cited official sources as of the date shown; adoptions and rules change. Confirm with the authority having jurisdiction before designing or permitting work.